CP Chem Polyethylene

OLD OCEAN, TX
OLD OCEAN, TX

Cajun was contracted to construct a petrochemical plant producing LLDPE and HDPE. Cajun was responsible for ACIP piling and testing. The compression design load for the piles ranged from 100 – 150 tons, and the lateral design load for the piles ranged from 10 – 23 tons.

Statistics

  • 12-month duration
  • 58,500 man-hours
  • 46 peak manpower
  • TRIR 0.00

Work Performed

  • Installation of 3,467 EA 16”
  • Installation of 24” diameter ACIP piles
  • Installation of 30 EA 20” diameter pipe piles
  • Installation of 36 EA 16” diameter ACIP piles at SIT yard