Engineering scope of work consisted of replacing all lift station piping (underground and aboveground) while minimizing plant wastewater lift station downtime. Cajun Engineering Solutions developed a phased construction sequence to minimize plant operation disruption – with input and coordination from plant operations and construction.
Shell Wastewater Line Upgrade
GEISMAR, LA
GEISMAR, LA
Work Performed:
Cajun Engineering Solutions provided multi-discipline engineering deliverables for this project.
Engineering Statistics
- 17-month duration
- 2,205 man-hours