Shell Wastewater Line Upgrade

GEISMAR, LA
GEISMAR, LA

Engineering scope of work consisted of replacing all lift station piping (underground and aboveground) while minimizing plant wastewater lift station downtime. Cajun Engineering Solutions developed a phased construction sequence to minimize plant operation disruption – with input and coordination from plant operations and construction.

Work Performed:

Cajun Engineering Solutions provided multi-discipline engineering deliverables for this project.

Engineering Statistics

  • 17-month duration
  • 2,205 man-hours