Hexion G6 Blower Building

GEISMAR, LA
GEISMAR, LA

This project consisted of the construction of a two-story 4,375 SF MCC/ Blower Building for Hexion’s G6 Gulfstream Project. Cajun Industries served as the General Contractor for the project.

Statistics

  • 11 month duration
  • 2,267 man-hours
  • 0.00 TRIR

Work Performed

  • Masonry
  • Access flooring
  • Metal canopies
  • Painting
  • HVAC work
  • Cast-in-place concrete
  • Structural steel fabrication and erection
  • Spray and injection foam insulation
  • Fluid applied membrane roofing
  • Hollow metal doors
  • Overhead coiling doors