Hexion Multi-Purpose Building

LULING, LA
LULING, LA

Cajun was contracted to build a single story 4,700 square foot multi-purpose building which consisted of a control room, laboratory, offices, conference room and an attached warehouse/storage area.

Accomplishments

The project was completed on time and under-budget.

Statistics

  • 8 month duration
  • 7,835 man-hours
  • 0.00 TRIR

Work Performed

  • Cast-in-place concrete
  • Masonry
  • Pre-engineered metal building erection
  • Thermal insulation
  • Hollow metal doors
  • Overhead coiling doors
  • Painting
  • Acoustical ceilings
  • Flooring
  • Metal canopies
  • Electrical and mechanical work