Lyondell LPO Debottleneck

LAPORTE, TX
LAPORTE, TX

Cajun was responsible for the paving and installation of foundations for a new furnace, cooling tower basin, and ammonia area pumps/sumps. As the general contractor, Cajun self-performed 85% of the work on this project.

Accomplishments

  • Cajun contracted to perform all pre-turnaround work on a cost reimbursable contract as a result of our performance on the project.

Statistics

  • 4-month duration
  • 53,432 man-hours
  • 90 peak manpower

Work Performed

  • Installed 4,698 cubic yards of structural concrete
  • Installed 1,213 cubic yards of concrete paving
  • Installed 2,245 lf of carbon steel and HDPE piping- 2”-20”
  • Installed 8,500 cubic yards of structural backfill
  • Installed 4,739 tons of cement stabilized sand underneath cooling tower slab