ExxonMobil Dock 5 Retrofit EPC

BAYTOWN, TX
BAYTOWN, TX

Cajun self-performed EPC services including detail design engineering and procurement for the Dock 5 hose tower structure – including pipe pile foundations, process piping, structural steel, equipment and E&I. Facility includes (3) 10” diameter, boom supported, marine loading arms for diesel export. Cajun is utilizing AWP in the execution of this project.

Work in progress

(October 2018)

Cajun Engineering Solutions is 95% complete with multi-discipline engineering deliverables for this project including:

  • Process
  • Piping
  • Civil/Structural
  • Electrical
  • Control Systems
  • Construction Management

Statistics

  • 6-month duration
  • 6,604 man-hours