ExxonMobil Dock 5 Retrofit EPC

BAYTOWN, TX
BAYTOWN, TX

Cajun self-performed EPC services including detail design engineering and procurement for the Dock 5 hose tower structure – including pipe pile foundations, process piping, structural steel, equipment and E&I. Facility includes (3) 10” diameter, boom supported, marine loading arms for diesel export. Cajun is utilizing AWP in the execution of this project.

Work Performed:

Cajun Engineering Solutions completed multi-discipline engineering deliverables for this project including:

  • Process
  • Piping
  • Civil/Structural
  • Electrical
  • Control Systems
  • Construction Management

Statistics

  • 6-month duration
  • 6,604 man-hours