Cajun self-performed EPC services including detail design engineering and procurement for the Dock 5 hose tower structure – including pipe pile foundations, process piping, structural steel, equipment and E&I. Facility includes (3) 10” diameter, boom supported, marine loading arms for diesel export. Cajun is utilizing AWP in the execution of this project.
ExxonMobil Dock 5 Retrofit EPC
BAYTOWN, TX
BAYTOWN, TX
Work in progress
(October 2018)
Cajun Engineering Solutions is 95% complete with multi-discipline engineering deliverables for this project including:
- Process
- Piping
- Civil/Structural
- Electrical
- Control Systems
- Construction Management
Statistics
- 6-month duration
- 6,604 man-hours