Cajun was contracted to drill and pour 102 drill shaft foundations ranging from 24” – 60” in diameter and from 12’ – 30’ deep for a new substation in Arkansas.
Entergy Arkansas Smackover Substation
SMACKOVER, AR
SMACKOVER, AR
Statistics
- 8 month duration
- 1,972 man-hours
- 14 peak manpower
Work Performed
- Drill, temporary case, and pour the shallower foundations
- Drill, slurry, and pour the deeper foundations
- Set full-length reinforcement cages
- Set anchor bolts
- Form and pour above grade caps