GMC–SPP3 Utilities, PVC PP5801& PP5802,VCM3 Phase 2 Expansions, & HAPF-4

Projects ❯
0

PEAK
HEADCOUNT

Project Stats

0

TOTAL
MANHOURS

0

TRIR (No
recordable
injuries)

PLAQUEMINE, LOUISIANA

GMC–SPP3 Utilities, PVC PP5801 & PP5802,VCM3 Phase 2 Expansions, & HAPF-4

Cajun Industries scope of services included site clearing and grubbing, piling, fabrication of pipe spools, underground piping, and concrete installation for a multi-unit plant expansion. Cajun successfully navigated the multidiscipline scope in multiple phases throughout the 5-year project completing each unit of the plant within the milestone schedule. Working with the owner to coordinate and schedule the phases of work allowed the owner to procure equipment and components of the plant in a timely manner. 

Work Performed

• 328,470 LF above group piping,
   diameters ranging from 1″ to 40″
• 3,263 TNS structural steel
   and erection
• 7,446 TNS structural steel
   and erection
• 6,733 pipe welds
• 368 pipe test packages
• 1,100 FT of large bore duct
• 168 EA piping tie-ins during
   a ten-day outage
• Installation of 129 EA pumps
• Installation & alignment of 754
   PCS of process
   rotating and static equipment
• 21,290+ CY concrete
• 13,700 TNS limestone
• 1,100 TNS reinforcing steel
• Performed heavy lifts
   and SPMT transport for
   large equipment