Cajun was awarded project to complete the new PVC Expansion Unit and Material Loading facilities at Formosa Plastics in Baton Rouge, LA. Cajun’s scope included structural steel and pipe fabrication as well as the install of all major equipment, structural steel and process piping. Additionally, Cajun performed all millwright work on owner supplied equipment and subcontracted all scaffolding paint and insulation.
Work Performed
• 990 CYDS of concrete poured • 955 Tons of steel erected • 124 Pcs. equipment set, including heavy haul and lifting of 4 major assets for the project • 39,069 Lf of pipe installed