The scope of work for this project involves the erection of structural steel, setting of equipment, and installation of piping for the expansion of an existing VCM unit. Cajun is the general contractor, overseeing all aspects, including scaffolding, painting, insulation, heavy lifting, and millwright services. This project includes building the new oxychlorination unit and extends to the interconnecting piping necessary to integrate it with the existing plant operations, ensuring an efficient expansion and enhancement of production capabilities.
Work Performed
• Installation of 658 TNS structural steel • Installation of 738 LF lined pipe • Installation of 7,488 LF alloy pipe • Installation of 51,777 LF CS pipe • Installation and alignment of 44 pieces of equipment