H&M Construction Pinnacle Alabama Pellets – New Barge
Cajun Industries was involved early in the design constructability and then contracted to construct the marine base load-out facility on the Black Warrior River for Alabama Pellets (Pinnacle Renewable Energy) to support a 360,000 annual metric ton wood pellet production plant.
Work Performed
• H Pile Installation – 27 EA (land based) • Radial Stacker Jackets – 5 EA Jackets with 4 EA 24” dia. pipe piles • Radial Stacker Frames and Precast Panels – 9 EA • Walkway Platform Jacket – 4 EA 24” dia. battered pipe piles • Mooring Dolphins – 11 EA varying in size (48”, 60” and 72”) • Installation of 20’ and 117’ gangway structures • Installation of floating barge access structure