KAO Specialties Americas, LLC – Bluebonnet

Projects > Featured

Project Stats

0

MONTH
PROJECT
DURATION

0

TOTAL
MANHOURS

TOTAL MANHOURS

0

PEAK
HEADCOUNT

PEAK HEADCOUNT

Pasadena, Texas

KAO Specialties Americas, LLC – Bluebonnet

The Bluebonnet Project encompasses the construction of a new state-of-the-art production facility for Kao Specialties Americas, LLC, located on a cleared brownfield site within an established industrial park in Pasadena, Texas. The development includes all site infrastructure, foundations, structural systems, process piping, mechanical equipment installation, and supporting facilities required to bring the plant into full operational service.

Cajun Industries is serving as both the General Contractor and Construction Manager, providing comprehensive project leadership, coordination, and execution throughout all phases of construction. In addition to managing subcontractors and overall project delivery, Cajun is self-performing several critical scopes of work, including civil construction, deep foundations and piling, aboveground and underground piping systems, and the installation of major mechanical equipment.

The project requires extensive integration of structural, mechanical, piping, instrumentation, and utility systems to support the facility’s production operations while maintaining the highest standards of safety, quality, schedule performance, and operational readiness.


Work Performed

• Installation of 626 Piles
• Excavate 15,308 CY material
• Installation of 9,500 CY concrete
• Installation of 1,550 TNS
   structural steel
• Set 230 pieces of
   mechanical equipment
• Installation of 80,000 LF A/G Pipe
   and 35,000 LF U/G Pipe
• Installation of 1,156 instruments
• Construction of 8 EA Metal
   Commercial Building

• Installation of 626 Piles
• Excavate 15,308 CY material
• Installation of 9,500 CY concrete
• Installation of 1,550 TNS
   structural steel
• Set 230 pieces of
   mechanical equipment
• Installation of 80,000 LF A/G
   Pipe and 35,000 LF U/G Pipe
• Installation of 1,156 instruments
• Construction of 8 EA Metal
   Commercial Building