Shell NORCO Outlet Piping Execution Plan

Projects ❯

Project Stats

0

TOTAL
MANHOURS

99

PEAK
HEADCOUNT

NORCO, LOUISIANA

Shell Norco Outlet Piping Execution Plan

Cajun was contracted by Shell to perform EPC services for the replacement of the Storm Water Impoundment Basin (SWIB) piping system. The project addressed end‑of‑life pump discharge piping and required an expedited, cost‑effective solution to maintain reliable storm water management operations. Cajun implemented an innovative approach by minimizing demolition and schedule impacts through the use of specialty HDPE pipe lining. In addition to the defined EPC scope, Cajun supported Shell during the SWIB outage by assisting with water management, delivering a safe and efficient solution that reduced operational risk and overall project cost.


Work Performed

Replaced end‑of‑life SWIB pump discharge piping, including 48‑inch underground lines and portions of the 54‑inch above‑ground header

Removed and replaced outlet spools and a large section of the 54‑inch discharge header serving three SWIB outlet bays