Cajun was contracted to utilize Advanced Work Packaging (AWP} to self-perform EPC services, which included the detailed design, engineering, and procurement for the Dock 5 hose tower structure located in Baytown, Texas. The facility includes (3) 1 0″ diameter, boom-supported, marine loading arms for diesel export. No weld rejections or nonconformance reports (NCR} with ExxonMobil.
Work Performed
• Process • Fabrication • Piping • Civil/Structural • Deep Foundation • Electrical • Control Systems • Construction Management