Shell Lemur GC

Cajun Industries was contracted to construct a new 4-story process testing facility within an existing plant, including process, and utility feeds from adjacent units. The project included a new centralized unit pipe rack with an associated pipe rack spur that extends from the central rack to connect the TP’s and OSBL equipment/ buildings to the new process building. OSBL included an analyzer building, RIE/MCC building, a horizontal CO2 Vessel supported at grade, a D.I. water tank supported at grade, multiple smaller equipment and skids supported at grade. A new control room for this unit was established by remodeling the lab area of an existing control room building adjacent to the new facility.


Work Performed

• Installation of ~500 CY
   of concrete foundations
   and area paving

• Installation of ~200 TNS of new
   rack and new process testing
   facility structural steel

• Setting of ~90 PCS of
   Mechanical Equipmennt
   including reactors, scrubbers,
   guard bed module, DP tube
   bank, hairpin exchangers,
   coolers, compressors, pumps,
   vessels, and tanks

• Installation of ~14,000’ of process
   and utility piping and 13 tie-ins

• Remodel of existing lab area
   to create a new control room

• Installation of ~500 CY of concrete
   foundations and area paving

• Installation of ~200 TNS of new rack and
   new process testing facility structural steel

• Setting of ~90 PCS of Mechanical
   Equipmennt including reactors, scrubbers,
   guard bed module, DP tube bank, hairpin
   exchangers, coolers, compressors, pumps,
   vessels, and tanks

• Installation of ~14,000’ of process and
   utility piping and 13 tie-ins

• Remodel of existing lab area to create a
   new control room