MZJV–GPX @ Golden Pass LNG

Projects ❯

Project Stats

0

MONTH
PROJECT
DURATION

0

TOTAL
MANHOURS

TOTAL MANHOURS

0

TRIR (No
recordable
injuries)

Sabine, Texas

MZJV–GPX @ Golden Pass LNG

Cajun Industries was contracted by MZJV (a joint venture between McDermott International and Zachry Industrial Group) to install helical production piles for the Golden Pass LNG Export Project in Sabine Pass, TX. The project involved converting an existing import facility into an LNG export terminal supplying global markets. Cajun executed the largest helical pile program in North American history, installing over 31 miles of piles totaling more than 16 million pounds of material.


Work Performed

• Install 1,824 high-capacity helical piles
• Piles ranged from 40′ to 120′ deep
• Shafts up to 18″ and helices up to
   40″ diameter
• Support loads up to 230 tons per pile
• Enable LNG export facility conversion