Golden Triangle Polymers – Chevron Phillips Chemical
Cajun was contracted by BMZ, a Joint Venture between Burns & McDonnell and Zachry Industrial Group, to install the pre-cast concrete test piles and pre-cast concrete production piles. The scope of work took place within the ISBL working limits of the Golden Triangle Polymers Project, which is a newly constructed polymers facility between the Joint Venture of Chevron Phillips Chemical and Qatar Energy. Cajun was able to work with the ISBL project engineers during the test pile program to optimize pre-cast concrete sizes for the production pile scope of work leading to cost savings for the client.
Work Performed
• Installation of 2,503 EA pre-cast concrete piles ranging in sizes of 16″x40, 16″x60′, 16″x75′, and 16″x80′ • 4 EA static load test • 52 EA dynamic load test