BMZ @ CPCHEM USGC II – OSBL Piling

Projects ❯

Project Stats

0

MONTH
PROJECT
DURATION

0

TOTAL
MANHOURS

TOTAL MANHOURS

0

TRIR (No
recordable
injuries)

ORANGE, TEXAS

BMZ @CPCHEM USGC II – OSBL Piling

Cajun Industries was contracted by BMZ, a joint venture between Burns & McDonnell and Zachry Industrial Group, to perform deep foundations work for the newly constructed Golden Triangle Polymers facility in Orange, Texas. Cajun’s scope included extensive piling and cofferdam installation to support construction in challenging soil conditions, contributing to one of the largest polymer manufacturing projects on the Gulf Coast


Work Performed

• Installed 7,764 precast concrete
   piles (18″ x 35′, 45′, and 60′)

• Completed 42 static and 385
   dynamic load tests

• Designed and installed 15
   temporary cofferdams