Client: Dow Chemical Company

Location: Plaquemine, LA

Description: Cajun received a contract as the general contractor for the turnkey construction of an ultra-purification water treatment plant. Cajun was responsible for the design-build of all civil work. Cajun’s scope of work included installation of 10,000 LF of carbon and alloy piping, erection of a metal building, installation of 250 tons of structural steel, setting and alignment of all heavy and rotating equipment, completion of over 1,200 field welds, installation of drill shafts, installation of 4,500 CY of structural concrete and placement of area paving.

Cajun performed over 150,000 man-hours with no OSHA recordable incidents. Peak manpower was 120.