Short Fork Waste Water Treatment Plant and Byhalia Road Pump Station

Client: USACE — Memphis District

Location: Hernando, MS

Description: This project was part of a county-wide sewer system upgrade. Cajun received awards for the 6 million gallon/day treatment plant and the 14,000 gallon/minute pump station. Cajun’s scope of work also included construction of a new head works facility, an administration building and a mile-long limestone access road and installation of a new splitter box, a new aeration basin, two 80’ diameter clarifiers, a UV disinfection/post aeration structure, a channel grinder, discharge piping, valves and flow meters.

Cajun’s scope included placement of 363,200 CY of imported fill, placement of 8,000 CY of structural concrete, installation of a lift gate, dewatering, installation of 54” and 24” effluent lines, installation of 16” submersible pumps and associated piping, utility modifications and placement of a 31' width x 27' length x 41' depth cast-in-place concrete pump station.

Cajun value engineered a caisson method for construction of the pump station, which resulted in significant savings to the government.

Photo Gallery

    • shortfork_9
    • shortfork_8
    • shortfork_7
    • shortfork_4
    • shortfork_6
    • shortfork_5
    • shortfork_3
    • shortfork_2
    • shortfork_1
15635 Airline Hwy., Baton Rouge, LA 70817 | 800-944-5857 | 225-753-5857 | Fax: 225-751-9777​ | Legal | Contact | Cajun Store | Team Portal © Copyright 2016, Cajun Industries, LLC