Cell Tower Construction

Client: Prime Tower Development

Location: Convent, LA

Description: Cajun was contracted by Prime Tower Development to install three drill shafts for a new 220’ cell tower location. Cajun drilled three 6′ diameter x 60′ deep drill shafts, installed reinforcing cages, installed anchor bolts for above grade pier caps and placed the associated concrete.